Originally published in the October 2026 issue of Bench & Bar of Minnesota Environmental Law Update, Minnesota State Bar Association.
On August 3, 2026, the Minnesota Court of Appeals reversed and remanded a decision by Vermillion Township that an environmental worksheet assessment (EAW) was not required for Pine Bend Paving, Inc.’s proposed mining and processing facility (the “proposed mine”) adjacent to Pine Bend’s existing mine. Resolution Denying EAW for Fischer Pit Expansion Project, 2026 WL 2224762 (Minn. Ct. App. 8-3-2026).
The proposed mine consisted of a 42-acre property, 33 acres of which would be used for mineral extraction, located adjacent to Pine Bend’s existing 29-acre mine site, which has been in operation since the 1980s. A group of citizens submitted a petition requesting an EAW, and Vermillion Township, the responsible governmental unit (RGU), determined an EAW was not required. The township determined the citizens “failed to provide material evidence that the proposed mine had the ‘potential for significant environmental effects’” because any effect would be mitigated by ongoing public regulatory authority and by mitigative measures proposed by Pine Bend.
On appeal, the citizens advanced several arguments. First, they contended that the township erred by deeming the proposed mine an expansion of the existing mine rather than a “connected action,” and that when the projects were considered together as connected actions, they exceeded the threshold for a mandatory EAW under rules implementing the Minnesota Environmental Policy Act (MEPA). See Minn. R. 4410.4300, subp. 12(B). However, because the citizens raised this argument for the first time on appeal, the court held they had forfeited it, citing Thiele v. Stich, 425 N.W.2d 580, 582 (Minn. 1988), and In re A.D., 883 N.W.2d 251, 261 (Minn. 2016) (quoting Thiele in certiorari appeal).
Second, the citizens argued the township acted arbitrarily and without substantial evidence by deciding the proposed mine was an “expansion” under MEPA. Minn. R. 4410.4300, subp. 1(B) provides that for an expansion of an existing project, the cumulative total of the two must be considered for determining if a mandatory EAW threshold has been met under MEPA; however, this only applies if the existing project began construction more than three years before the application for the expansion. The court held the township correctly determined the proposed mine was not an expansion since the existing mine commenced construction in the 1980s, well beyond the three-year cutoff.
Finally, the citizens argued that the township’s EAW decision was arbitrary and capricious because material evidence showed the proposed mine may have the potential for significant environmental effects. The court declined to evaluate the township’s consideration of the evidence, however, because the court determined the township applied the wrong legal standard. Specifically, whereas MEPA’s threshold for preparation of an EAW is when materials evidence demonstrates “there may be potential for significant environmental effects.” Minn. Stat. § 116D.04, subd. 2a(e) (emphasis added), the township’s decision indicated the citizens’ evidence failed to demonstrate the proposed mine “will have the potential for significant environmental effects” (emphasis added). This error, the court held, imposed a more rigorous standard of certainty than MEPA requires; as such, the court remanded the matter to the township to apply the correct legal standard to the citizens’ petition and to issue a revised decision.
For more information or questions, contact Jeremy Greenhouse.